K1_Soil_water_chemistry

K1 was placed on the well-drained Cassiope heath close to the climate station close to K2. Soil water samplers (suction cup lysimeters) are installed in depths of: 5, 10, 15, 20, 30, 40, 50 and 60 cm below soil surface. K1 operation periode from 1996 to 2001.

Data and Resources

Additional Info

Field Value
Source https://data.g-e-m.dk/datasets/10.17897/3TMT-H704
Version 1
Citation Read the documentation, GEM terms of use and how to cite: https://data.g-e-m.dk/guides. Please get in touch with the GEM secretariat if you need help to cite correctly.
Temporal coverage 1996-06-24 → 2013-08-23
Spatial coverage 74.47°N, -20.57°E
Station zackenberg-research-station
Variable measured
Publisher Greenland Ecosystem Monitoring